• NL  |  EN  |  FR
  • Calculation
  • Sitemap

Case Study High Speed Line - Netherlands

30th June 2006

Case Study High Speed Line - Netherlands

The Dutch High-Speed Line follows a gentle 100-kilometer curve from Amsterdam to the Belgian border. The entire route is a succession of 170 elevated or immersed structures such as flyovers, underpasses, embankments, U-boxes, four tunnels, and a major bridge.

Arcelor Projects B.V. supplied over 50 000 metric tons of steel products, including sheet piles used as retaining walls/cofferdams, MV-anchor piles and strutting constructions made of H beams and steel tubes.

You can find more information about these steel solutions in our new brochure High Speed Line South - Netherlands.

Summary:

  • Introduction
  • The route
  • Noordrand tunnel
  • Ringvaart aqueduct
  • Oude Maas and Dordtse Kil tunnels
  • Facts and figures
  • Conclusion
This brochure can be ordered on the documentation request form or can be viewed and downloaded on the documentation download page.

To download the PDF file (2,89 MB) of this brochure without opening it:
  • PC: Right-click on the link "PDF file" and select "Save Target As..." or "Save Link As...", depending on your browser. From the "Save As" dialog box, select a folder and click on "Save".
  • Mac: Control-click on the link "PDF file" and select "Download link to disk". From the "Save" dialog box, select a folder and click on "Save".