• NL  |  EN  |  FR
  • Calculation
  • Sitemap

Newslog

Participation in Piling & Deep Foundations Dubai - 20th January 2010

ArcelorMittal Projects Dubai is once again participating as an associate sponsor in a piling summit this month end.

Piling & Deep Foundations Dubai 2010 is an exclusive four day event where our professional speaker will be presenting on advanced ArcelorMittal solutions...

Read more

Participation in Middle East events - 2nd September 2009

Piling and Deep Foundations Saudi Arabia

ArcelorMittal Projects Dubai is participating as an associate spon­sor in two of the leading summits during the month of November this year.

The two summits - Bridges Middle East 2009 & Piling and Deep Foundations Saudi Arabia - are exclusive four day events where our professional speakers will be presenting on advanced ArcelorMittal solutions...

Read more

Bending moment capacity added to calculation sheets - 10th August 2009

In the calculation sheet for pipes and combined walls and the calculation sheet for sheet piles, a cell has been added to show the bending moment capacity. To calculate the bending moment the steel grade can be selected from a drop down list...

Read more

New GU sheet piles - 15th June 2009

The development of an improved GU hot rolled sheet pile produced in Dabrowa, Poland, was triggered by the amazing success of the existing GU 600 range in new markets. Major development was to modify the interlock shape such to become fully compliant with the ArcelorMittal LARSSEN interlock already produced in the sheet pile rolling mills in Belval and Rodange, Luxembourg.

A second improvement was to optimize the steel thicknesses of the new sections for higher efficiency in the section modulus range of 600 to 800 cm³/m...

Read more

Discontinuation of ICE dealership - 15th May 2009

Due to the merger of the two leading Dutch piling and vibratory hammering firms ICE (International Construction Equipment) and PVE-Dieseko (Piling and Vibro Equipment), the sales and renting of ICE vibratory hammers in Belgium has been transferred to the new company ICE-PVE. Consequently, the ICE dealership of ArcelorMittal Projects Belgium for the Belgian market will be discontinued...

Read more

General catalogue 2009 - 11th May 2009

General catalogue

The 2009 English edition of our 'General catalogue' is available for downloading and for dispatching. This new version includes the new HZM/AZ combined wall system, as well as the updated values of the steel grades and rolling tolerances of tubular steel piles following the standard ISO 3183 (2007).

You will notice that the new HZM/AZ system replaces the existing HZ/AZ. The steady success of the HZM/AZ combi-wall strengthens our decision to shorten the transition period from the old HZ to the new HZM sections...

Read more

New PU 14R in production - 10th February 2009

After the successful launching of the PU 8R in March 2008 and the PU 10R in June, the PU 14R is now available as well.

The PU 14R section has a thickness of 11.0 mm in the flange, and as the other U-sections, it can be rolled up and down by 1.0 mm to result in the PU 15R and the PU 13R. The PU 14R range is available in all steel grades of EN 10248, from S 240 GP to S 430 GP, in lengths up to 24,0 m. The sheet piles can be paired and crimped on request...

Read more

Dubai Maritime City - Ship Lifts - 12th December 2008

Welding of boxpile

The Dubai Maritime City consists of a 2 km² man-made peninsula providing different areas of business, housing and marinas as well as ship repair facilities which are equipped with two ship lifts with a capacity of 3000 and 6000 tons.

With the execution time being the crucial criterium, hot rolled sheet piling was proposed to built the retaining walls of the ship lifts. Finally the main walls are made of AZ 50 in lengths from 23.0 to 24.5 m, whereas the anchor walls are made of AZ 18 sheet piles of 8.5 m long...

Read more

ArcelorMittal Projects on Infratech 2009 - 4th December 2008

From January 13th to 16th, Infratech 2009 opens its doors at Rotterdam (The Netherlands).
The trade fair for ground-, road and hydraulic engineering gives, with more then 400 exhibitors, a complete overview of this sector.

ArcelorMittal Projects Netherlands BV will be present with a stand.

You can register for free here. You can print your free admission ticket which can be exchanged ...

Read more

Quay walls and mooring dock at Cuxhaven, Germany - 18th November 2008

Cuxhaven combiwall

In February 2008, the Governement of Lower Saxony approved the construction of Berth 8 in the old 'Grodener Hafen', which includes a production yard for the steel foundation elements of wind turbines.

Berth 8 will comprise a 160 m mooring dock, a 115 m waiting area for the transport ships, and a 116 m long loading area built perpendicular to the dock and the waiting area. A water depth of 9.5 m is projected for the three mooring spots at Berth 8...

Read more